St. Joe Dam CI

The Need: This dam, originally constructed in 1932, was in dire need of rehabilitation services. As the primary intake source for the City’s raw water supply, this was a matter of some importance.

The Answer: Total rehabilitation services, including epoxy injection of concrete cracks, vertical and horizontal concrete demolition and patching, fiber reinforcement on structural beams, pier demolition and patching and the complete replacement of the electrical system.

VS Involvement: Engineering Technologies (E-Tech) – since acquired by VS – was commissioned to perform construction inspection. This project involved coordination not just with City representatives, but also with the contractors and subcontractors.

back to Construction Inspection homepage