The Need: Improvements to mobility along an 18.5 mile stretch of SR 256. Drainage and roadside safety features were also in need of an upgrade.

The Answer: Improve the roadway (reconstruction and resurfacing) along this corridor of SR 256, and make safety modifications at the intersecting roadways.

VS Involvement: VS coordinated with the INDOT – Seymour District, and with officials in the Town of Austin, on this project. Throughout changing project parameters, VS handled all steps of the Right-of-Way engineering, from topographical surveying and aerial photography and on.