The Need: Bridge 126 over Rattlesnake Creek was deteriorating, and required restoration of the structural integrity to extend its usefulness.

The Answer: Replacement and Rehabilitation of this structure.

VS Involvement: VS was instrumental in obtaining funding for this project. VS engineers assisted in the application and presentation to INDOT to achieve the funding. Final design and coordination of the project included total replacement of the superstructure, with additional work on the substructure.

back to Structural Engineering homepage

Sm-Structure Struc