The Need: Total replacement of an aging bridge over Little Buck Creek, with consideration as to environmental effects of the new structure.

The Answer: Design a new bridge to improve and stabilize the structure, with complete environmental review and documentation.

VS Involvement: As Prime Consultant, VS provided total project coordination and management, including field survey and investigation, evaluation of existing information including IDNR reports, and analysis of alternatives. The final bridge design has improved roadways and safety features such as fencing and retaining wall.