The NeedTraffic delays were increasing, due to heavy truck traffic near this interchange.

The Answer: Expansion of the roadway, in the form of additional lanes, including a replacement of the current pavement on the roadway.

VS Involvement: By adding two travel lanes – one each direction – on SR 2, and increasing the number of lanes on access ramps, VS Engineering expedited traffic flow in this high-commerce area.  In addition to the travel lanes at the interchange, VS added signing and lighting and upgraded the drainage system.

back to Transportation Engineering homepage

Fremont, IN

Northside Neighborhood Revitalization - Aurora, INI-70 and US 41 Interchange Modification - Terre Haute, IN