The Need: Disrepair due to neglect, in an area with abrupt elevation changes, failing infrastructure and drainage, threaten the vitality of this neighborhood.

The Answer: Aurora devised a Neighborhood Revitalization plan, to make safety improvements and create upgrades, including a major, one-of-a-kind, stormwater outfall into Arnold’s Creek.

VS Involvement: VS worked side-by-side with contractors doing construction to resolve long-standing neighborhood street issues. Key design elements on this IOCRA funded project included ADA-compliant sidewalks, and roadway improvements including resurfacing and period lighting.

back to Transportation Engineering homepage

Fremont, IN

I-65 & SR2 Interchange Modification - Lake County, INI-70 and US 41 Interchange Modification - Terre Haute, IN