The Need: Heavy traffic congestion due to increased urbanization led to a need for upgrades and roadway improvements at this interchange.

The Answer: Expansion of the existing ramps and replacement of the current pavement on the roadway, plus upgrades to the sidewalk, traffic signals, drainage and other incidental improvements.

VS Involvement: VS provided total project coordination and management on this project, in conjunction with two other projects being administered simultaneously in the area. As the design team, VS engineers coordinated this Interchange project with an INDOT (Crawfordsville District) wetland mitigation project and the Gateway to Terre Haute project, also affecting the location.