The culvert replacement on River Road over the Elizabeth Warren Drain in Carmel Indiana included the clearing and removal of the existing structure; installation of caissons and a structural cap over existing twin 36 inch diameter, concrete water mains; installation of express footings (precast); installation of 105 LF of 12 FT wide x 10 FT high concrete culvert with over 100 LF of precast wing wall on each end; with steel railing installed on top of the wing walls. Included was reconstruction of the existing roadway, signage and pavement markings.
VS contracted with the City of Carmel as the project representative for the construction phase of the culvert replacement project. Full-time inspection staff consisted of one Project Engineer/Supervisor and one Inspector as needed.
VS primary responsibilities during construction included: